Installation
Equipment Installation
System installation can be a major cost factor for the system
since the labor of trenching splicing, installing, backfilling,
etc. often exceed the cost of the installed equipment. Typically,
Nitor either subcontracts the installation work to a construction
contractor or the construction contractor will server as the
prime contractor for Nitor. Nitor can also act as a subcontractor
supplying the equipment. Nitor performs system start-up and acceptance
testing under either of the arrangements. Nitor training will
consist of training for installation procedures, operations,
and maintenance of the system.
Installation of the PROWLER system is critical for proper operation
of the system, most problems occur with damage to the equipment
and especially the sensor tubing itself. If proper care and attention
are not given during the installation process, cuts or other
damage to the sensor tube may cause results that will adversely
affect the system operation. The leak-detection system is frequently
installed as part of a much larger construction project, and
often extends over several months , which makes it impractical
and cost prohibitive for Nitor to keep personnel on-site at all
times. Handling and storage of the equipment is crucial. For
this reason, proper training of the installation contractor personnel
will be critical to a successful and problem free installation.